Northern Mist
Superstructure Photos Page 4
|
||
![]() |
The whole assembly has been dragged out of the building shed on the jig, and the men are preparing for the lift Temporary man hole cut where door will go.... |
|
|
A nice shot of the flying bridge . Setting up the rigging cables for the crane.... |
![]() |
|
![]() |
Heads up , incoming Pilot House ! Total time to assemble and install the kit was 3 weeks to the day! Now that's a time savings ! |
|
|
A perfect landing. The house will now be scribed to fit the steel deck and bolted to a steel flange with an isolating gasket of neoprene. There must be no electrical connection between the 2 metal types. NOTE: For lightening protection there must be a bonding strap added between the 2 structures, but this is made indoors away from salt .... |
![]() |
|
![]() |
The Final Product | |
|